Outfitting Ecoraster E50 Permeable Grids at a Giant Tiger Facility
Ecoraster’s permeable paving solution was chosen for this application to help with the drainage in the mechanical room area, while ensuring the surface was easily and safely accessible by heavy equipment.
The installation went quickly, and the permeable grids were easily cut to conform to the existing solid structures in the area.
Ecoraster E50 was installed in August/September 2017 at the Giant Tiger distribution center in Johnstown, Ontario.